Boneg-Safety and durable solar junction box experts!
Have a question? Give us a call: 18082330192 or email:
iris@insintech.com
list_banner5

Competitive price 1500V good quality split junction box PV-BN3H1B

Short Description:

This solar junction box adopts full Potting-glue, waterproof, has been certified by TUV. Suitable for all half cell of crystal silicon above 166 type.Diode adopts chip and copper frame modular design,beautiful appearance,less glue etc.The junction box is suitable for the module back connection process.


Product Detail

Product Tags

Description

This solar junction box adopts full Potting-glue, waterproof, has been certified by TUV. Suitable for all half cell of crystal silicon above 166 type.Diode adopts chip and copper frame modular design,beautiful appearance,less glue etc.The junction box is suitable for the module back connection process.The junction box can reduce the power consumption of PV modules and improve electrical reliability.

Technical data

Rated voltage 1500V Flame Class UL94-V0 (TUV)/5VA(UL)
Rated current 30A Cable Specifications 4mm2
 Operating temperature -40°C-+85°C(TUV)/-40°C-+90°C(UL)  Waterproof Structure  Potting
Safety class Class II  Waterproof rating IP68
 Application level Class A Potting Glue quantity 8g X 3
 Maximum bus bar width 8mm  Busbar connect ion Soldering
 Insulation Material PPE  Contact Material Copper,Tin-Plated   ,

Product Configuration List

 Diode Rated Voltage 30A
 Diode Type SB5045
 Diode Qty 3
PV-BN3H1A (2)
image005

Application

Unshielded solar panels for thin film batteries to improve solar energy

Solution

● PV module’s ribbon alignment must be complied with JB’s mounting hole of the terminal base.

● Adhesive and sealing compound, Potting glue must be applied by using specific type and specification. Make sure JB will be fixed in the correct position and reliable sealant. The potting glue level should be over the top surface of Diodes and terminal base. In order to avoid electrical shock risk.

● Don’t move PV module or JB before adhesive and sealing compound or potting glue solidify.

● Ensure soldering between Ribbons and terminal reliably in order to avoid missing soldering or false soldering. The soldering operators must be professionally trained. More soldering time will cause the diodes damaged.

● Adopt anti-static protection solutions when touch or solder JB.

● Make sure the connection method between JB and PV module in the correct polarity. Otherwise, Wrong connection will cause fire.

● PV module manufacturer should inspect the diodes of JBs before shipment since the diodes might be damaged by heat temperature or the static shock.

● Installation or maintenance should be operated by the professional personnel.

● For protection against electric shock, while being assembled or disassembled, make sure connectors isolated from the power supply.

● Don’t connected or disconnected under load.

● During the assembly process, keep the connector away from any corrosive materials.

Why Choose Us

Company adhere to the “quality win, sincere first, small profits of city” as the principle, in line with people-oriented, high-quality, efficient service the forerunner of the idea, continuously introduce advanced management mode and high-tech talent, around the ISO9001 international quality system standard, creates the brand bu quality,seek development by innovation, in order to scale efficiency,dedication to customer service.

Attention

1.Gently holding and releasing in transportion, no damage to product.
2.When installing the junction box, making sure the solar panel is not working and you can’t touch the plus and minus rails at the same time avoiding an electronic shock and diode disruption.
3.Do not connect the plus and the minus together of the same junction box at any time.
4.Do not insert and withdrawal the plus and minus connector frequently except repairs ecause the sealing performance will be cut down.
6.When installation, evenly smear the silica adhesive on the base of the junction box in order to prevent leakage.
7.Keep the rubber clean and no adhesive when assembly, or it affect the efficiency of the panel.
8.Keep paraffin away from PV junction box and connector, such as, oil,ubricant,electric revival,and other paraffin substance

FAQ

1) Are you a factory or trading company?
We have our own factories.

2) What is your FOB port?
FOB Shanghai, and we can according to customer requirements.

3) What is your delivery time?
3-7 days for samples, 10-30 days for large quantities, according to your order.

4) How about your after-sale service?
We can offer you timely and best after-sales service. Now we have built our relationship in many overseas countries like Brazil, Pakistan, Japan and German. It makes our after-sale service very easy and effective to reach you. Also our 24 hours online inquiry service is available.

5) Can I have my own logo on your products?
Yes, OEM&ODM service is available.

6) How to guarantee the quality of your products?
Our products have U L, TUV, IEC, RoHs, SGS and other certifications.


  • Previous:
  • Next:

  • Write your message here and send it to us