Boneg-Safety and durable solar junction box experts!
Have a question? Give us a call: 18082330192 or email:
iris@insintech.com
list_banner5

Professional manufacturing 1000V MC4 connector

Short Description:

This connector for PV ground power stations distributed power system interconnection.The connector nut with resistance to prevent loose structure design,metal parts inside adopt the T2 copper tin plating processing,contact the spring coil adopts high quality beryllium cooper tin plating,contact resistance is lower and lower power consumption,the connector shell adopts imported PPE materials,the service life of 25 years.It is the same match as the original MC4 connector.


Product Detail

Product Tags

Technical data

Rated voltage 1000V Flame Class UL94-V0 (TUV)/5VA(UL)
Rated current 30A  Waterproof rating IP68
 Operating temperature -40°C-+85°C(TUV)/-40°C-+90°C(UL) Safety class Class II
 contact resistance ≤ 0.5mΩ  Insulation Material PPE
 Cable Specifications 1.5-6mm2  Outer diameter of cable 4.5mm-7mm
image005

Application

Used for photovoltaic systems

Solution

Installation or maintenance should be operated by the professional personnel.
● For protection against electric shock, while being assembled or disassembled, make sure connectors isolated from the power supply.
● Don’t connected or disconnected under load.
● During the assembly process, keep the connector away from any corrosive materials.

Installation Instruction

1.Get a junction box and its base by a clean soft cloth with alcohol.
2.Panel back-sheet Upon, dry, no oil and other dirty. Clean the back-sheet area by a
clean soft cloth with alcohol.
3.Stroke straight the rubber by a pincers,keep vertical against the back-sheet.
4.Get a bottle silicon, cut the mouth of the bottle, making sure the diameter is 4mm, insert it into the air gun, screw cover, no cut on mouth of the air gun.
5.Put the junction box on working desk, get the air gun and keep vertical against the junction box base, gluing around the junction box base edge circle.
6.Get the rubber through the junction box base hole, press hardly the junction box on the back-sheet till the silicon overflow around.
7.Place panels across in the air currents 10 hours till the silicon cures.
8.Check the reliability of each terminal connection, and press the raised bus bar on the connection terminal by hand.
9.Cover the junction box with a click sound, the should not be pick out by hands.

FAQ

FAQ1

  • Previous:
  • Next:

  • Write your message here and send it to us